I have been associated with Coal India Limited through one or more of her subsidiaries for more than 40 years now. I started my career as a Junior mine engineer with CIL in 1973 and retired as General Manager in the year 2005.During this period I got the oprrtunity to work at various coal fields in India as well as visited mines around the world.
Post retirement I started up my own consultancy and served as chief consultant for Prakash Industry Limited,CGM in SEML as well as VP-Mines in FECPL.
Papers Published
- Entitled “Necessity of Reclamation of Land Damaged by Mining Operations.” (NEWSEKTCH).
- Entitled “Use of Steel Tram Line Sleepers in Underground Mines – Mine Metal & Fuel”.
- Entitled “Mine Mechanization in Underground Mines of SECL with Special Reference to SDL” presented in the International Seminar on Mine Mechanization & productivity held at Banglore in 1991.
- "Hard Roof Management as tried in DATONG Coalfield.” Paper presented in ISM in 1995 and published by Institute of Engineers in their journal.
- “Proposed Amendments in Coal Mines Act & Regulation”. Paper presented in Seminar held at Bilaspur Regional Engineering College in 1995.
- “Strategy for improving the production in Underground Mine – Special reference to SECL”. Paper presented in National Seminar MINPROPS – 98 held at Chandrapur Engineering College, Chandrapur (February’98).
- “Research and development in SECL” – Special item on SECL – Mine Metal & Fuel – July, 1999.
- “A Need For Realistic Assessment of Power Coal Demand” –Seminar held in 1999 Marketing of Indian Coal and its challenge - at Bilaspur (Year 1999).
- “Selective Mining of Power Coal by Opencast” – Seminar held in Nagpur (Year 2000).
- “Hard Roof Management for Higher Production from Underground” – Seminar held at Nagpur-Indian Mining
- Problem & Prospectus in MGMI Chapter (Year December 2002).
- “Mining Prospects during Xth and XIth Plan Period in SECL” – Refocusing on Technology and marketing activities for sustainable development of SECL – Seminar held in Bilaspur in 2002.
Key Achievements
- Associated with World Bank project on behalf of SECL , CME China (PSLW project negotiation) , PSLW project of Russia
- Registered as a Recognized Qualified Person to prepare mining plans by Ministry of Mines. Ref No. RQP/NGP/338/2005/A.
- Registered as a Recognized Qualified Person to prepare mining plans by Ministry of Coal. Ref No. 34011/(23)/2005-CPAM.
- Awarded UNDP Fellowship in Safety Engineering in September, 1985 and visited Turin (Italy, U.K., and West Germany
- 41 years experience in Project appraisal, Techno – Economic evaluation of project report, coal linkage, long wall mining, Project planning and as Team Lead for ECL/SECL mines.
Employment History
1)
General
Manager (Land and Siding) @ South Eastern Coal Field Limited
Responsibilities
held
Ø
Acquisition of land for mining project.
Ø
Construction /
Maintenance of railway siding
Ø
Supervision of
SECL projects constructed by RITES/IRCON
Ø
Railway related
case regarding derailment, Railway claim , for service rent , rate tribunal
case.
2)
OSD in
Coal Controller Organization @ South Eastern Coal Field Limited
Responsibilities
held
Ø
Mine opening
permission , coal grading , coal sampling under control of MOC
3)
Chief
Mining Engineer / Dy.Chief Mining Engineer @ South Eastern Coal Field Limited
Roles
and responsibilities held
Ø Perspective
planning and Project planning.
Ø
Project
monitoring, research and development, Coal linkage, Mine Operation Plan.
Ø
Interaction with
NIRM, CMRI and other research institute.
Ø
Powered support
to Long wall Mining requirement
4)
Dy.Chief
Mining Engineer @ Central Mine Planning & Design Institute
Roles
and responsibilities held
Ø
Prepration of
project report for approval by respective boards and PIB
Ø
Monitoring /
Supervision /author of various projects
Ø
Name of some of
the import project
o SheethaldharaUG
0.8 MT
o Khairaha 0.58MT
o Damini 0.48MT
o BherabandUG 0.6 MT
o Kurja UG 0.4 MT
o Bangwar
UG 0.36MT
o Navagaon 0.36MT
o Amadnad 0.3MT
o Jhiria 0.3 MT
o Kanchan 0.3 MT
o Rajendar
PSLW 0.6 MT
o Balrampur
PSLW 0.54MT
o New
Kumda 0.54MT
o Churcha 0.64MT
o PSLW
failure report 0.64MT
o Piparia 0.24MT
Ø
Associated with
world bank assisted projects
Ø
Associated with
introduction of Mass – Production Technology
Ø
Preparation of
Technical/techno Economics Report of different bidders
Ø
Interaction with
Ministry of Coal etc.